A 40- to 50-acre permanent campus in Miami-Dade County, Florida — built to deliver The Lone Operator Experience for decades, at a fraction of today's cost.
Acres planned, Miami-Dade County
Of every cohort's cost currently spent renting facilities
Targeted site development start
Today, every cohort rents its environment — commercial range time, dojo access, lodging, and transport. That works, but it caps quality and scheduling, and burns roughly $11,000–$12,000 of each cohort's $60,000–$75,000 recurring cost on facilities The Institution will never own. A permanent campus eliminates most of that rental cost and gives donors a visible, permanent institution rather than a program renting rooms.
Land and construction costs run measurably higher in Miami-Dade than in several other South Florida counties. The Institution is proceeding there anyway because the strategic value outweighs the premium:
Site selection will formally evaluate at least one lower-cost alternative site within commuting distance of that same donor and recruiting base before land is closed.
Community, media, and member space is deferred to Phase 2, to keep the Phase 1 construction budget disciplined. Site development is targeted to begin Q1 2029, following entitlement and environmental review.
Site selection and due diligence include zoning and range-entitlement review before land closes. If range entitlement cannot be secured on the selected parcel, Phase 1 proceeds on schedule without an on-site live-fire range — classrooms, dojo, staging, physical-training and recovery space, and lodging are unaffected, while range-specific instruction continues through existing off-site range partnerships until a range-capable parcel or variance is secured.
Capacity is reserved on the site plan for a future accredited K-12 school integrating leadership development and self-defense instruction — funded by future campaigns, and deliberately excluded from the current $10,000,000 request to keep it tight and deliverable.